Location:

Dakota Woolstore – Hot Water Plant Renewal

Timeframe:

3 Days

Description:

The upgrade of the commercial hot water plant for 94 woolstore apartments was completed in 3 days.

Google Rating
5.0
Based on 60 reviews
×
js_loader

 

Services Used
Challenges:

The old system had 6x boosters that were around 82% efficient (when new), were upgraded to 3 Thermann condensing boosters with 96% efficiency! 

6x boosters and 2x storage tanks were replaced with 3x boosters and 1x storage tank, thanks to new technology from Thermann. These apartments are now saving over 14% on their gas consumption for hot water.

All work was done on time and on budget with minimal interruption to residents. Take a look at the before and after photos – we even rebuilt the shed!

Request an on-site quote

Talk to us today for a comprehensive on-site quote for pipe relining,
water jetter, CCTV pipe inspection and more!

Get Your Quote
or call us on 07 3358 3201

Confirm your Plumbing Health Check

To confirm your plumbing health check simply fill out the form below and one of our friendly staff will be in touch to book in your appointment.

Start your enquiry here

  • Hidden
  • This field is for validation purposes and should be left unchanged.